Our Power Projects
132/33KV GAS INSULATED SYSTEM (GIS) SUBSTATION AND 132 DIAMETER EXTENSION AT IHIALA, ANAMBRA STATE
Engineering, procurement and construction of 2x60mva 132/33kv gas insulated system (gis) substation (new), orlu imo state and 132kv diameter extension at ihiala substation, anambra state (nipp lot 30t) the works includes but not limited to all substation arrangment, electro-mechanical works, cabling (wiring) and pre-commissioning and commissioning of new transformers with the bays and associated outgoing line feeders and asssociated civil works.
Status: COMPLETED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
330/132/ 33KV ALAGBON GIS SUBSTATION
Substation arrangement: 330kv gis substation (1 and ½ breaker arrangement), 132 kv (double busbar) and 33kv indoor switchgear (single busbar), 1x300mva 330/132/33kv autotransformer and 2x60mva power transformers, 2 nos 132kv lines diameter (bay), 2 nos 132kv transformers diameter (bay), 132kv bus-bar arrangement, 2 nos 33kv transformers bays, 33kv tubular bus-bars and 6 nos outgoing 33kv feeders.
Electromechanical works: installation of hv swicthgear, control and protection panels, control and power cable laying and termination, earthing works, overconnection works, fire alarm system, battery room, cctv, installation of terminal tower, pre-commissioning and commissioning.
Status: COMPLETED
STRINGING OF 330KV DC TRANSMISSION LINE BETWEEN PAPALANTO-IKEJA WEST
Ikeja west/ayede 330 kv double circuit transmission line (lagos/ogun) complete stringing of 12.4km 330kv double circuit transmission lines from the terminal station at papalanto to the existing ikeja west-ayede 330 kv transmission line. This includes the stringing of acsr bison conductor, 330kv double circuit transmission line circuit, earth wire and opgw.
Status: COMPLETED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
132KV CONTROL & PROTECTION PANELS AND 33KV SWITCHGEAR AT ORLU
Engineering, procurement and construction of 2x60mva 132/33kv gas insulated system (gis) substation (new), orlu imo state and 132kv diameter extension at ihiala substation, anambra state (nipp lot 30t) the works includes but not limited to all substation arrangment, electro-mechanical works, cabling (wiring) and pre-commissioning and commissioning of new transformers with the bays and associated outgoing line feeders and asssociated civil works.
Status: COMPLETED
132KV SWITCHYARD AT NKALAGU TRANSMISSION SUBSTATION
Engineering, procurement and construction of 7 x 60mva132/33kv ais substations at benin north, agbor, asaba and nkalagu (extension) substations. Substation arrangement: 2x 60mva 132/33kv transformers, 2 nos 132kv lines diameter (bay), 2 nos 132kv transformers diameter (bay), 132kv bus-bar arrangement, 2 nos 33kv transformers bays, 33kv tubular bus-bars and 6 nos outgoing 33kv feeders.
Electro-mechanical works: installation of hv swicthgear, control and protection panels, control and power cable laying and termination, earthing works, overconnection works, pre-commissioning and commissioning. Associated civil works: design and construction of control buildings, staff quarters, equipment foundation, internal substation roads, security house, chain link fence, drainages et-al.
Status: COMPLETED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
330/132/33KV AJA GIS SUBSTATION-NIPP LOT 13
Substation arrangement: 330/132kv gas insulated system (gis) substation type, 4nos. Of 330kv transmission line bays, 1x150mva 330/132/33kv autotransformer, 132/33kv gis substation type, 2 nos of 132kv transmission line bays and 1 x 100mva 132/33kv transformer, tubular bus-bar arrangement etc
Electro-mechanical works: installation of hv swicthgear, control and protection panels, control and power cable laying and termination, earthing works, overconnection works, pre-commissioning and commissioning. Associated civil works: equipment foundation, internal substation roads, security house, chain link fence, drainages et-al.
Status: COMPLETED
2X60MVA 132/33KV SUBSTATION AT ASABA S/S
Engineering, procurement and construction of 7 x 60mva132/33kv ais substations at benin north, agbor, asaba and nkalagu (extension) substations. Substation arrangement: 2x 60mva 132/33kv transformers, 2 nos 132kv lines diameter (bay), 2 nos 132kv transformers diameter (bay), 132kv bus-bar arrangement, 2 nos 33kv transformers bays, 33kv tubular bus-bars and 6 nos outgoing 33kv feeders.
Electro-mechanical works: installation of hv swicthgear, control and protection panels, control and power cable laying and termination, earthing works, overconnection works, pre-commissioning and commissioning. Associated civil works: design and construction of control buildings, staff quarters, equipment foundation, internal substation roads, security house, chain link fence, drainages et-al.
Status: COMPLETED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
CLIENT NAME: NIGER DELTA POWER HOLDING COMPANY (NDPHC) LIMITED
EPC OF 132KV DOUBLE CIRCUIT TRANSMISSION LINE BETWEEN ASABA – AGBOR IN DELTA STATE
Engineering, procurement and constructon of 132kv double circuit transmission lines and associated substations at benin north, agbor, asaba and nkalagu (extension)- nipp lot 8. We did Engineering, procurement and construction of 132kv transmission line – agbor-asaba 132kv double circuit (51.9km) including but not limited to design, manufacture, supply, erection and commissioning of galvanised lattice steel towers, line hardwares and insulators, stringing of acsr conductors, stringing of opgw, installation of anti-vandals bolts and nuts and other associated works. The 132kv line runs parallel to the existing 330kv benin-onitsha line.
Status: COMPLETED