Description: With Dorman Long Engineering Limited, we ensure that all electrical and instrumentation (E&I) works on Madu Production Platform (MADP) are engineered, procured, installed, and commissioned within the agreed timeline. The complete E&I installation works consisted of the following: cable tray installation, E&I support installation, laying of cables, installation of E&I equipment, installation of tubing, termination, calibration, pre-commissioning works for the Madu Conductor Supported Platform ( MADU CCP).
Status: Ongoing